Describe the property and the business objective.
Start with the property location, brand or independent positioning, project type, room count, areas involved, and whether the hotel will remain operational. Explain the reason for the work: renovation, conversion, repositioning, or a newly developed space.
Then describe the desired guest experience and practical priorities. “Refresh the lobby” is a starting point; “create a more useful gathering space while preserving the front-desk operation” gives the team a decision to work toward.
Collect the inputs in six groups.
Requirements
Share the current property improvement plan (PIP), brand comments, owner requirements, and known approval deadlines. Identify the document version and unresolved interpretations rather than combining old and new instructions.
Existing information
Gather plans, current photos, prior specifications, and known field changes. Mark documents that have not been checked against the property. Discuss whether an existing-condition assessment is appropriate.
Areas and quantities
List guestrooms by type, public areas, and other spaces included. Separate items to retain, repair, replace, or investigate. If quantities are preliminary, label them that way.
Budget assumptions
State the target and what it covers. Separate design, product purchases, freight, tax, storage, installation, construction, and contingency as applicable. Identify allowances that still need pricing.
Schedule and operations
Include target completion, phased room closures, access hours, delivery restrictions, storage options, and major construction milestones. Distinguish a desired date from a confirmed requirement.
People and approvals
Name the owner decision-maker, operator, designer, architect, contractor, and brand contacts already involved. Agree who reviews design, approves spending, and authorizes changes.
Make the first meeting a decision meeting.
Bring three short lists
- Fixed: requirements the team must work within.
- Flexible: options that can be evaluated against cost, timing, and design intent.
- Unknown: questions that need information, pricing, verification, or another professional’s input.
A brief is a working reference, not a substitute for the engagement agreement or approved construction documents. Update it when the scope changes and keep the decision record with the current project information.
For an adaptive reuse project, add context.
Explain how the existing space is used now, what function is proposed, and which parts of the building are outside the intended scope. Identify any historic preservation requirements, features to retain, and specialists or reviewing bodies already involved. Do not assume an existing drawing resolves every site question.
The Fairfield + TownePlace project in downtown Dallas reimagined a historic-building basement with a custom-designed interior and a newly added bar.
See the Dallas adaptive reuse case studyStart with the information you have.
If parts of the brief are unknown, identify them. JSM can help define the next questions and the services needed to answer them.