Skip to main content

JSM Owner Resources · Scope & responsibilities

Procurement or
custom sourcing?

The distinction is simple: procurement purchases an established specification; custom sourcing helps develop the path to a custom item. A project can need either—or both.

First, identify what is already decided.

If the designer has issued an approved product specification, the starting point is procurement: matching the item, quantity, finish, and other requirements to the purchasing scope. If the item still needs a suitable source, material development, or custom detailing, define that sourcing work before treating it as ready to order.

JSM can provide custom sourcing as a stand-alone service. It does not require a full interior-design engagement.

Use the right starting package.

01

For procurement

Bring the current specifications and drawings, quantities by area or room type, approval status, delivery requirements, and a list of items excluded from the purchasing scope.

02

For custom sourcing

Bring the design intent, reference images, dimensions, material and performance requirements, target budget, quantity, and any sample or prototype expectations.

03

For an integrated engagement

Identify which decisions JSM will develop through its design scope and which belong to an outside designer, brand, owner, contractor, or other consultant.

Make approval responsibilities explicit.

In a stand-alone sourcing or procurement-only engagement with an outside designer, that designer’s design-review and approval responsibilities should be identified. When JSM is commissioned for design, JSM develops and reviews the design within that agreed scope. Those are different arrangements-not one universal approval rule.

For sourcing, JSM facilitates communication between the source and designer, coordinates samples and drawings as scoped, and negotiates pricing and terms. Before release, identify who approves design, quantities, dimensions, finishes, and changes-and where that approval will be recorded.

Compare the complete proposal, not just the unit price.

Record assumptions while they are still decisions-not after the order has been released. A quoted schedule should be read together with its approval, payment, production, and delivery conditions.

See custom sourcing in context.

At Hy-Lo Hotel in Calera, a custom geometric bear became a distinctive project feature. The case study illustrates a custom sourcing assignment rather than a claim that every project needs a one-off object.

Explore the Calera custom sourcing story

Not sure which scope fits?

Send the specification or concept you already have, along with quantity, location, target budget, and timing.

Discuss procurement or sourcing